Compact track carrier installing a galvanized helical pile on a sandy coastal new-construction lot with elevated framing beyond.

Coastal custom homes · SC & NC

Piles that hold. Foam that seals.

New-construction helical foundations and spray foam insulation — quoted together for builders within about 100 miles of North Myrtle Beach.

Two services

Foundation. Insulation. One accountable crew.

Builder package

Foundation to insulation, one sub.

Carolinas competitors usually sell piles or foam — not both. We quote the pad and the envelope so your schedule keeps one crew through framing milestones.

  • Helical layout with the engineer of record
  • Torque logs and as-built for inspection
  • Open- or closed-cell foam from the same plans
See the package
Elevated coastal custom home on a sandy lot with open undercroft.
Elevated coastal home — piles below, foam often under the floor.

Why helicals

Built for soft coastal pads.

Soft coastal and marsh soilsReach a deeper bearing layer under loose sand, fill, and organics common along the Grand Strand and Lowcountry.
Flood zones and raised floorsDetail for compression, uplift, and lateral load when the home is elevated or mapped in a flood zone.
No concrete cure wait on the pileSteel piles are ready for the footing or grade-beam connection once installed and accepted — the pile itself does not cure.
Quick open-ground installA typical new-home array often installs in a day, depending on pile count, depth, access, and weather. Bid the job you have.

Process

Four steps from plans to as-built.

01

Plans and geotech

Share structural plans and any geotechnical report. We review reactions, flood zone notes, and access. A visit is not a design and not a substitute for the engineer of record.

02

Layout and quote

We coordinate a pile layout with the engineer of record and provide a fixed-price proposal for installation. Torque targets and stop criteria belong to that design.

03

Install and torque logs

A hydraulic drive head rotates each pile. Depth and torque are recorded. Caps or brackets are set as designed. Weather, tides, and obstructions can change the schedule.

04

As-built for engineer and inspector

You receive an as-built pile plan and torque log to hand to the engineer of record and the inspector. Sign-off remains with those parties.

Worker in PPE spraying closed-cell foam under elevated floor joists.
Closed-cell under a raised floor — PPE on, joist bays filling.

Spray foam

Seal the envelope on the same build.

Open-cell for many walls and attics. Closed-cell where density and underside floor sealing matter. No R-value theater on this site — we quote from your drawings.

Open-cell vs closed-cell

Gallery

Pads, piles, and foam in the field.

Next step

Send the plans. Get a clear quote.

Helical foundations, spray foam, or both.